|
Material |
Random Polypropylene |
|
Size |
full 20mm through 63mm available |
|
Pressure Rating |
2.5MPa or other nominal pressures availale upon request |
|
Installation |
Welding, fusion |
|
Color |
white, green, gray, or customized color |
|
Joint |
Joining pipe and socket joint fittings by socket fusion joint |
|
Packing |
Export package or as customer's request |
Tee with side inlet is one of the most commonly used PPR accessories. As an innovative manufacturer of high-performance plumbing products, Zhuji Primy Pipe Co., Ltd. Offers a full line of PPR pipes and fittings crafted to deliver strength, ease of use and an attractive appearance.
Pipe fitting installation precautions:
When installing pipelines, especially hot water pipes, the thermal expansion factor of pipelines should be considered. When connecting pipelines, the turning Angle of pipelines should be applied to naturally compensate the expansion of pipelines where space allows. When using natural compensation, the pipeline bracket should adopt sliding support, but the maximum length of straight pipelines without fixed supports should not be greater than 3m. The natural compensation of the three-way connection of the pipeline and the linear pipeline can be installed by using two pipe hoops and three-way installation.
The pipe support should be buried before the pipe installation, and the pipe clamp and hanger should be set according to different pipe diameters and requirements. The position should be accurate, the buried should be smooth, and the pipe clamp should be in close contact with the pipe, without damaging the pipe surface. When metal pipe clamp is used, soft materials such as plastic should be used between the metal pipe clamp and the pipe. In the connection part of the metal pipe fittings and the water supply PP-R pipe, the pipe card should be located on the side of the metal pipe. A fixed bracket should be installed at the valve, water meter and other water supply equipment, and its weight should not act on the pipeline. The maximum installation distance between cold and hot water pipe supports meets the requirements. When hot and cold water pipes share supports, determine the distance between hot water pipe supports.
Horizontal pipe bending in vertical and horizontal direction, vertical pipe vertical, row pipe installation deviation must meet the design requirements and relevant regulations.
After installation, pressure test must be carried out before direct and indirect burying. The pressure test pressure of the cold water pipe shall be 1.5 times the working pressure of the system, but shall not be less than 0.9MPa; The test pressure of the hot water pipe is 2 times the working pressure, and the pressure test must be carried out before the direct burial and non-direct burial after the installation of the pipe. The pressure test pressure of the cold water pipe shall be 1.5 times the working pressure of the system, but shall not be less than 0.9MPa; The test pressure of the hot water pipe is 2 times the working pressure, but not less than 1.2MPa. But not less than 1.2MPa.
Hot Tags: ppr tee with side inlet, China ppr tee with side inlet manufacturers, suppliers, factory, Overlapped Aluminum Plastic Composite Pipe, PERT AL PERT Pipe, PPR Female Thread Socket, PPR Hot Water Pipe, PPR Fitting, PEX Pipe




